- From: Reza Samavi <reza.samavi@utoronto.ca>
- Date: Mon, 17 Sep 2012 11:43:47 -0400
- To: public-prov-comments@w3.org, Mariano Consens <consens@mie.utoronto.ca>
Received on Monday, 17 September 2012 17:28:16 UTC
Dear Provenance Working Group, I think at least 2 constraints are missing in the following document: http://www.w3.org/TR/prov-constraints/#constraints One can express an activity (a) start-time using: a prov:startedAtTime t1; The same activity (a) start-time can be expressed by: a prov:qualifiedStart [ a prov:Start prov:atTime t2]. I think these two sentences are equal in PROV-DM. If my interpretation is correct, then there should be a constraint saying for the same a, t1=t2. Then a similar constraint is required for activity end-time. I'm not sure if the objective of constraint 29 and 30 was to cover the above mentioned constraints. Thanks, Reza -- -- Reza Samavi, PhD Candidate, University of Toronto Department of Mechanical & Industrial Engineering 8140 -- Bahen Center for Information Technology 40 St. George St., Toronto, Ontario, M5S 2E4, CANADA Tel. (416) 946-0110
Received on Monday, 17 September 2012 17:28:16 UTC