- From: Norman Walsh <ndw@nwalsh.com>
- Date: Tue, 24 Jun 2014 12:50:47 -0500
- To: public-xml-processing-model-wg@w3.org
- Message-ID: <87y4wmtcw8.fsf@nwalsh.com>
XProc Agenda 25 Jun 2014
Meeting 248.
The XML Processing Model (XProc) WG will meet on Wednesday, 25 Jun 2014 at
[1]10:00a EDT (07:00a PDT, 14:00GMT) for one hour on the W3C Zakim Bridge,
[2]+1-617-761-6200 (or [3]via SIP), passcode [4]97762# ("XPROC").
XProc uses the [5]#xproc IRC channel on irc.w3.org:6665 (or via the [6]web
interface). The IRC channel is used for managing agendas, minutes, and
other aspects of the teleconference, so please join us there if at all
possible.
See the [7]XProc WG page for pointers to current documents and other
information. If you have additions to the agenda, please email them to the
WG list before the start of the telcon.
1. Administrivia
1. Roll call.
2. Accept this agenda.
3. Next meeting: 2 July 2014.
5. Review of open action items:
* [8]A-227-01: Norm to review variable/option scope/shadow
language and test cases
* [9]A-229-01: Norm to comment on 21002 with proposed
wording.
* [10]A-230-01: Henry to create dated and undated versions of
the schemas and pipeline library in appropriate locations
* [11]A-230-02: Norm to propose errata along the lines
described in msg 2013Mar/0028
* [12]A-230-03: Norm to propose the erratum to resolve bug
21003
* [13]A-230-04: Norm to propose the erratum to resolve bug
21004
* [14]A-230-06: Norm to put Henry's erratum text in the errata
document
* [15]A-230-07: Norm to setup a test case for the optional
option/p:namespaces binding and see what implementations do.
* [16]A-231-01: Norm to propose a resolution for bug 21007.
* [17]A-235-01: Alex to provide a use case for user-defined
extension functions in XProc
* [18]A-235-01: Alex to prepare a note with the table of use
cases and solutions from V1.
* [19]A-237-01: Liam to update the charter page or link from
the PMWG homepage
* [20]A-237-02: Norm to review the curly-brace template stuff
in XSLT and see how it compares to p:template
* [21]A-237-08: Norm to editorialize usage of the term
“connection”
* [22]A-241-04: Norm to construct an actual errata document
* [23]A-241-05: Alex to describe use cases for RDF support
that require the ability to go back and forth from the
triples to the documents.
* [24]A-252-01: A-252-01 Jim to draft a proposed response to
the SCXML WG.
6. Rechartering
2. Technical
1. Action on actions?
2. Steps for zip/unzip? (Why'd they fall of the action list?)
3. Progress on bug reports?
4. Progress on parameters spec?
3. Any other business
References
1. http://www.timeanddate.com/worldclock/fixedtime.html?month=06&day=25&year=2014&hour=10&min=0&sec=0&p1=43
2. tel:+1-617-761-6200
3. http://www.w3.org/2006/tools/wiki/Zakim-SIP
4. tel:97762#
5. irc://irc.w3.org:6665/#xproc
6. http://www.w3.org/2001/01/cgi-irc
7. http://www.w3.org/XML/Processing/
8. http://www.w3.org/2013/02/20-xproc-minutes.html#action01
9. http://www.w3.org/XML/XProc/2013/03/20-minutes#action01
10. http://www.w3.org/XML/XProc/2013/04/24-minutes#action01
11. http://www.w3.org/XML/XProc/2013/04/24-minutes#action02
12. http://www.w3.org/XML/XProc/2013/04/24-minutes#action03
13. http://www.w3.org/XML/XProc/2013/04/24-minutes#action04
14. http://www.w3.org/XML/XProc/2013/04/24-minutes#action06
15. http://www.w3.org/XML/XProc/2013/04/24-minutes#action07
16. http://www.w3.org/XML/XProc/2013/05/08-minutes#action01
17. http://www.w3.org/XML/XProc/2013/08/21-minutes#action01
18. http://www.w3.org/XML/XProc/2013/08/28-minutes
19. http://www.w3.org/XML/XProc/2013/09/26-minutes
20. http://www.w3.org/XML/XProc/2013/09/26-minutes
21. http://www.w3.org/XML/XProc/2013/09/26-minutes
22. http://www.w3.org/XML/XProc/2014/01/29-minutes
23. http://www.w3.org/XML/XProc/2014/01/29-minutes
24. http://www.w3.org/XML/XProc/2014/02/05-minutes#action01
Received on Tuesday, 24 June 2014 17:51:24 UTC