Alistair, Sean,
As all LC comments have now effectively been dealt with, we can
prepare for the CR decision. We would need from you a message with:
- a pointer to the proposed CR SKOS Reference document
- a pointer to the changes since CR
- short overview how LC comments were handled (number of issues,
how many closed/postponed, formal objections)
status:
58 comments received (Issues 129-158, 160-187)
8 issues postponed so far
17 open issues:
we need to close/postpone these at the telecon
no formal objections
- proposed decisions wrt the three LC features at risk
Assuming the WG decides to request CR, the Ralph, Tom and I
will draft a CR request and schedule a meeting with the director
(Steve or Tim). We hope at least one of you can attend.
Guus